Delta Faucet Headquarters Addition and Renovation

AEC-ME partnered with Delta Faucet to design a three-story, 80,000 SQFT addition to their headquarters located in Carmel, Indiana.  This addition created much needed open and collaborative working environments for staff. The extention also added display & showroom space, conference rooms, training rooms, areas for testing and research/development of projects, and a cafe and kitchen.

The research and development laboratory in the basement provides large water cisterns to allow the research team to recycle hot and cold water separately. The lighting systems included LED and advanced controls for occupancy detection and modulation of the illumination levels to increase energy efficiency. The heating, cooling, and ventilation system for the building emphasized sustainability, user comfort, and zoned control all with a low first cost. To accelerate the finished project, the design and construction was split into a site/structural phase and a building phase, allowing contractors to mobilize and begin construction before the finishing touches were designed. AEC-ME was responsible for providing mechanical, electrical, plumbing, fire protection, fire alarm, access control, security and telecommunications engineering.